This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| etd_digitization_project_shipping_process [2017/06/29 13:50] – annk | etd_digitization_project_shipping_process [2022/05/16 19:28] (current) – jeustis | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ===== PAGE OUTDATED ARCHIVED ===== | ||
| + | |||
| **ETD Digitization Project Shipping Process** | **ETD Digitization Project Shipping Process** | ||
| - | |||
| - | **Link to ETD Workflow Google doc:** | ||
| - | |||
| - | https:// | ||
| **Item Process Statuses:** | **Item Process Statuses:** | ||
| Line 15: | Line 13: | ||
| **Pulling and checking dissertations for damage pre-scanning** | **Pulling and checking dissertations for damage pre-scanning** | ||
| - | Working from the Master ETD list? select | + | Working from the Masterfile |
| - | Create a pull list for the students following the examples on the W: drive. | + | Create a pull list for the students following the examples on the W: drive. |
| * Have students pull titles from shelves | * Have students pull titles from shelves | ||
| * Note any missing titles as these will have to be requested from the Bunker | * Note any missing titles as these will have to be requested from the Bunker | ||
| - | Check all titles for damage or missing pages (see Lorraine James to train new students). A more detailed | + | Check all titles for damage or missing pages. |
| * YELLOW SLIP is for items with **double-sided** pages | * YELLOW SLIP is for items with **double-sided** pages | ||
| Line 38: | Line 36: | ||
| Make notes of physical problems to add to the picklist, and place volumes on W.B. Meyer trucks in call number order. | Make notes of physical problems to add to the picklist, and place volumes on W.B. Meyer trucks in call number order. | ||
| - | |||
| - | Student will change the item Process status to DI (in process for scanning) using a handheld scanner | ||
| **Requesting from the Bunker** | **Requesting from the Bunker** | ||
| Line 61: | Line 57: | ||
| __Part 2__ | __Part 2__ | ||
| - | Receive Depository items at UM and check out DP/UM items under MATMAN user. | + | Receive Depository items at UM and check out DP/UM items under MATMAN user. See detailed instructions at W://ETD Digitization Project/ |
| + | |||
| + | All items will receive an Item Process Status of DI. Prepare the Pick List, using the Opticon device (DPN2001 Companion Application software required (Appload)). Student will change the item Process status to DI (in process for scanning) using a handheld scanner. | ||
| - | All items will receive an Item Process Status of DI. Prepare the Pick List, using the Opticon device (DPN2001 Companion Application software required (Appload)). | ||
| __Part 3__ | __Part 3__ | ||
| - | Check in returning Bunker items | + | W://ETD Digitization Project/ |
| **Creating the picklist** | **Creating the picklist** | ||
| Line 106: | Line 103: | ||
| Then using Aleph Services change all the item process statuses on the new shipment from DI (in process for scanning) to DO (out for scanning). | Then using Aleph Services change all the item process statuses on the new shipment from DI (in process for scanning) to DO (out for scanning). | ||
| + | //updated 7/3/2017 by AMK// | ||