This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
shelf-ready_processing_of_approvals_and_selection_slips [2012/02/22 19:53] spease |
shelf-ready_processing_of_approvals_and_selection_slips [2012/02/22 19:58] spease |
||
---|---|---|---|
Line 32: | Line 32: | ||
♦If the book will go to the New Book Shelf, change the "Item Processing Status" to "PW". | ♦If the book will go to the New Book Shelf, change the "Item Processing Status" to "PW". | ||
- | ******EXCEPTION:** If there are more books than the new book shelf can hold (15 red book truck shelves or the equivalent of 2.5 red book trucks using both sides of the trucks) the item processing status should be set to blank on the excess books and they should be put on trucks for items going to Stacks Management for shelving directly to the Du Bois stacks. | + | ******EXCEPTION:** If there are more books than the new book shelf can hold (15 red book truck shelves or the equivalent of 2.5 red book trucks using both sides of the trucks) the item processing status should be set to blank on the excess books and they should be put on trucks for items going to Stacks Management for shelving directly to the Du Bois stacks. |
♦If the book is not yet ready for the New Book Truck or the Science Truck, change the "Item Processing Status" to "PC". | ♦If the book is not yet ready for the New Book Truck or the Science Truck, change the "Item Processing Status" to "PC". |