This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
shelf-ready_processing_of_approvals_and_selection_slips [2009/06/08 13:28] jbajgier |
shelf-ready_processing_of_approvals_and_selection_slips [2009/06/08 13:29] jbajgier |
||
---|---|---|---|
Line 22: | Line 22: | ||
♦If the book will go to the New Book Shelf, change the "Item Processing Status" to "PW". | ♦If the book will go to the New Book Shelf, change the "Item Processing Status" to "PW". | ||
- | ******EXCEPTION:** If there are more books than the new book shelf can hold (15 red book truck shelves or the equivalent of 2.5 red book trucks using both sides of the trucks) the item processing status should be set to blank and the excess books put on trucks for items going to Stacks Management for shelving directly to the Du Bois stacks. | + | ******EXCEPTION:** If there are more books than the new book shelf can hold (15 red book truck shelves or the equivalent of 2.5 red book trucks using both sides of the trucks) the item processing status should be set to blank on the excess books they should be put on trucks for items going to Stacks Management for shelving directly to the Du Bois stacks. |
♦If the books is going to the Cataloging Dept. for extra work, change the "Item Processing Status" to "PC". | ♦If the books is going to the Cataloging Dept. for extra work, change the "Item Processing Status" to "PC". |