This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
evolving_workflows_-_2016 [2017/02/27 20:07] skrash |
evolving_workflows_-_2016 [2017/02/27 20:09] skrash |
||
---|---|---|---|
Line 43: | Line 43: | ||
* Determine how training will occur and establish a timeline | * Determine how training will occur and establish a timeline | ||
* Document workflows (new, changed and those that stay the same but have not already been documented) | * Document workflows (new, changed and those that stay the same but have not already been documented) | ||
- | * 8.Conduct training/implement updated departmental structure: //Jan-June 2017// | + | * 8.Conduct training/implement updated departmental structure: //Jan-February 2017// |
__Proposed Timeline:__ | __Proposed Timeline:__ |