Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
evolving_workflows_-_2016 [2016/05/20 15:46]
skrash
evolving_workflows_-_2016 [2016/05/20 15:49]
skrash
Line 6: Line 6:
  
 Evolving Workflows Action Plan: Evolving Workflows Action Plan:
-  ​1.Discuss action plan: March/​April +  ​1.Discuss action plan: March/​April 
-    ​At March 30th department meeting +    ​At March 30th department meeting 
-    ​In April at unit meetings +    ​In April at unit meetings 
-    ​At April 27th department meeting +    ​At April 27th department meeting 
-  ​2.Review and document current workflows: May-July +  ​2.Review and document current workflows: May-July 
-a.Staff/​peer-to-peer review/​analysis +    ​* ​a.Staff/​peer-to-peer review/​analysis 
-b.Record each separate workflow +    ​* ​Record each separate workflow 
-3.Analysis of workflows: May-July +  ​* ​3.Analysis of workflows: May-July 
-a.What do we need to keep doing? +    ​* ​What do we need to keep doing? 
-b.What are we doing that needs to change? +    ​* ​What are we doing that needs to change? 
-c.What can we stop doing? +    ​* ​What can we stop doing? 
-d.What do we need to be doing that we are not doing? +    ​* ​What do we need to be doing that we are not doing? 
-4.Card sort activity: August  +  ​* ​4.Card sort activity: August 
-a.Create cards of updated workflows +    ​* ​Create cards of updated workflows 
-b.Divide department personnel into 4 to 6 groups for this activity +    ​* ​Divide department personnel into 4 to 6 groups for this activity 
-c.Each group will sort like workflows into separate categories/​groupings +    ​* ​Each group will sort like workflows into separate categories/​groupings 
-d.Record the results from each group +    ​* ​Record the results from each group 
-5.Analysis of card sort activity: August (starting at retreat) +  ​* ​5.Analysis of card sort activity: August (starting at retreat) 
-a.See what was the same across groups +    ​* ​See what was the same across groups 
-b.See what was different +    ​* ​See what was different 
-c.Present findings so everyone is informed before moving to the next step +    ​* ​Present findings so everyone is informed before moving to the next step 
-6.Identify possible models for department organization:​ Sept +  ​* ​6.Identify possible models for department organization:​ Sept 
-a.Combine needs, discards and shifts to come up with at least 2 possibilities for the evolution of our current departmental structure/​workflows +    ​* ​Combine needs, discards and shifts to come up with at least 2 possibilities for the evolution of our current departmental structure/​workflows 
-b.Discuss as a group and select the best option +    ​* ​Discuss as a group and select the best option 
-c.Design new departmental structure +    ​* ​Design new departmental structure 
-7.Pre-implementation:​ Oct-Nov +  ​* ​7.Pre-implementation:​ Oct-Nov 
-a.Rework and refine job descriptions +    ​* ​Rework and refine job descriptions 
-b.Establish a preliminary list of positions needed +    ​* ​Establish a preliminary list of positions needed 
-c.Determine how training will occur and establish a timeline +    ​* ​Determine how training will occur and establish a timeline 
-d.Document workflows (new, changed and those that stay the same but have not already been documented) +    ​* ​Document workflows (new, changed and those that stay the same but have not already been documented) 
-8.Conduct training/​implement updated departmental structure: December & forward+  ​* ​8.Conduct training/​implement updated departmental structure: December & forward
  
  
evolving_workflows_-_2016.txt · Last modified: 2019/01/07 17:20 (external edit)
[unknown link type]Back to top
www.chimeric.de Creative Commons License Valid CSS Driven by DokuWiki do yourself a favour and use a real browser - get firefox!! Recent changes RSS feed Valid XHTML 1.0